The ETC also offers features that are simply unavailable on the older Westinghouse units. These features include a remote mountable display with digital three-phase ammeter, flashSAFE arc-flash reducing maintenance mode, and MODBUS communications. The ETC can be supplied as part of a complete “kit” that includes all new components. This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your. ETC Instruction Manual. ETCQ Series Instruction Manual. ETCE Series Instruction Manual. ETCS Series Instruction Manual. ETCG Series Instruction Manual.
The Trip Unit Test Kit is used to test and verify the pickup levels and time delay settings of a breaker's Trip Unit. The original Test Kits were developed to test the Amptector Trip Units of the DS Breaker. With the introduction of microprocessor based Trip Units (Digitrip, Optim, etc), modifications to the original Test Kits (-G01 and -G02). Amptector. Notes: The UVTA is reset with every cycle of the breaker, regardless of the method of trip. The original seismic testing of the OTS switch showed contact bounce in excess of milliseconds. The cycle life of the charging motor, SRD, and STA are for the DS and DSL breakers only. In the other applications the life of. Effective November Instruction Booklet IB J Supersedes IB I Dated 10/98 Instructions for Low Voltage Power Circuit Breakers Types DS and DSL.
cautions for digitrip rms or optim testing: note: do not use tester style dg01 or dg02 to test a digitrip rms or optim trip unit as damage to the trip unit will occur. 1. do not test digitrip rms trip assembly while breaker is in the “connected” position. 2. if possible, testing should be per-formed with the trip assembly under. AVO, Instruction Manual for Circuit Breaker Test Sets Multi-Amp Bulletin-2 ET, Field testing of low voltage power circuit breakers. Amptector model #DG03 manual Instructions for Low-Voltage Power Circuit Breakers Types DS and DSL, I.B. IG. the TEST Position.. Place the Breaker. in. the CONNECT Position Remove the Breaker for Final Inspection. Final Inspection. Amptector Settings. Place the Breaker. in. Service 19 19 20 21 21 21 21 21 21 Section 5-Description. and Explanation of Operation General. 22 The Operating Mechanism.
0コメント